ENERGY INTEGRITY
Landmark Projects

Fueling the
Future of Energy

Engineering and constructing high-precision infrastructure for the Oil & Gas sector. From massive LNG Terminals to complex pipeline networks, we deliver energy security with uncompromised safety.

Explore Projects
Zero-Incident Safety Record

6.5 MTPA

Terminal Capacity Handled

EPC Mode

Full-Scale Delivery

International

Compliance Standards
IN-HOUSE ENGINEERING

Storage Tanks: Engineering Competence

Providing comprehensive design and analytical solutions for high-hazard storage systems across global standards.

Refrigerated Storage

Precision design for complex low-temperature storage units.

  • LPG, Propane & Butane Tanks
  • Propylene Refrigerated Tanks
  • Ext. / Int. Floating Roof Tanks

Advanced Engineering

Strategic designs for underground and mounded storage.

  • Fixed Roof (Cone, Dome, Truss)
  • Mounded Bullets & Spheres
  • Underground Cavern (Strategic Petroleum)

Seismic & Analysis

Ensuring integrity through rigorous structural modeling.

  • Wind & Seismic Analysis of Tanks
  • Column & Rafter Supported Roofs
  • Mechanical & Electrical Integration
COMPETENCE ON GLOBAL CODES
American Codes
API 650 API 620 API 625 API 653 AWWA D100 UBC ASCE-07 AISC 360
European Codes
EN 14620 EN 14015
Indian Codes
IS 803 IS 875 IS 1893 IS 800

100%

IN-HOUSE COMPLIANCE

Petronas ExxonMobil Shell KNPC ADNOC Technip Toyo Bechtel Fluor EIL Adani IOCL BPCL Petronas ExxonMobil Shell KNPC ADNOC Technip Toyo Bechtel Fluor EIL Adani IOCL BPCL
CRYOGENIC STORAGE EXPERIENCE

LNG & Ethylene Tanks

11

TOTAL UNITS EXECUTED

-162°C CRYOGENIC
2 Units
Dhamra, Odisha
Dhamra LNG Terminal

(Adani – TotalEnergies JV)

Engineering & construction of 2 × 180,000 m³ storage tanks for India’s strategic regasification facility.

SEISMIC DESIGN
2 Units
Ennore, Tamil Nadu
IOCL LNG Terminal

(for MHI Japan)

Delivery of 2 × 180,000 m³ tanks meeting stringent international cryogenic and seismic requirements.

LARGEST HUB
2 Units
Dahej, Gujarat
Dahej LNG Terminal

(for IHI)

Construction of 2 × 148,000 m³ storage tanks, supporting India’s largest LNG import hub.

EXPANDED CAPACITY
2 Units
Hazira, Gujarat
Shell Hazira Terminal

Enabling Regasification

Execution of 2 × 160,000 m³ LNG tanks, enabling expanded regasification and storage capacity.

STORAGE CLUSTER
3 Units
Dabhol, Maharashtra
Dabhol LNG Terminal

Single Location Cluster

Delivery of 3 × 160,000 m³ LNG tanks, forming one of the country’s largest storage clusters.

EXTREME -105°C
2 Units
Panipat, Haryana
IOCL Ethylene Storage

Petrochemical Network

Construction of 2 × 17,000 m³ Ethylene tanks supporting IOCL’s polymer production network.

All cryogenic projects executed with 100% compliance to global safety and insulation standards for liquefied gases.

Midstream Infrastructure

Refrigerated Tanks
Experience

Specialized containment solutions for LPG, Propane, and Propylene at scale.

Mundra LPG Terminal Project

Mundra, Gujarat | India’s Largest Refrigerated Tanks

EPC of 2 x 47,000 m³ Propane / Butane / Propylene Storage Tanks, setting a benchmark for terminal capacity in the region.

94,000 m³ Combined Capacity
52,000 m³ LPG / Propane
LPG Terminal Project

Indian Oil Petronas Pvt. Ltd

Ennore, Tamil Nadu: 2 x 26,000 m³ Storage Units.

26,000 m³ Propylene
Naphtha Cracker Project

IOCL

Panipat, Haryana: 2 x 13,000 m³ specialized propylene storage.

81,986 m³ Cryogenic
Reliance Jamnagar Complex

Reliance Industries

Gujarat: 2 x 40,993 m³ High-spec Cryogenic Storage Tank Package.

International Landmark

RAPID Tank Farm Project

Johor Bahru, Malaysia

As part of PETRONAS' visionary RAPID (Refinery And Petrochemical Integrated Development) project, we contributed to building a grass-root integrated complex designed to meet Asia’s surging energy and chemical demands.

Project Scope & Capabilities
  • 300,000 BPSD Refinery
  • Naphtha Steam Cracker
  • 1.28M Tons Ethylene/Year
  • Petrochemical Derivatives
  • Utilities & Off-site Units
  • Jetty Installations
Strategic Location: Pengerang, Kota Tinggi District
Petronas

Project Owner: Petronas Malaysia

300k

Barrels per Day

1.28M

Tons Ethylene/Yr

Deep

Conversion Scheme

Integrated

Refinery Complex

Located in close proximity to international shipping lanes connecting the Straits of Malacca, Singapore, and the South China Sea.

Strategic Partnership

Reliance Jamnagar
LPG Storage Expansion

4th Repeat Order

Awarded for consistent excellence and performance.

Awarded by Reliance Petroleum Limited, India’s largest refinery, this project stands as a testament to our engineering reliability and impressive past performance.

38,230

Capacity (m³)

-46°C

Storage Temp
Reliance Industries
  • Scope: Design, Supply, Fabrication, Installation & Commissioning assistance.
  • Application: Dedicated LPG Storage for high-capacity refinery operations.
  • Performance: Repeat order based on impressive execution of similar previous tanks.
COMPLETED: JUNE 2006
Singapore Operations

Bulk Liquid Products Terminal

Horizon Terminals Pte Ltd, Singapore

A massive infrastructure project involving the design, fabrication, and installation of a 840,000 m³ capacity terminal, including complex pile foundations and repeat orders for massive expansions.

59 Tanks

Total Units Installed

840,000 m³

Combined Capacity

SINGAPORE FIRST: Jacking Method of Tank Erection
Silver Plaque Award

Awarded for completing 2 Million Safe Man-Hours without LTI (Lost Time Injury).

Phase 1

30 Tanks completed in June 2007.

Phase 2 Expansion

Additional 23 Tanks completed in Sept 2008.

Project Scope: Complete end-to-end delivery including design, procurement, fabrication, construction, and pile foundation installation.

JURONG ISLAND, SINGAPORE

Helios Terminal Facility

A comprehensive bulk liquid storage and blending facility located at the strategic Meranti cluster.

21
STORAGE TANKS High-spec blending units
Project Completion MAY 2008
Project Owner: Helios Terminal Corp

Full Lifecycle Execution

Our scope encompassed the entire technical value chain, ensuring that the blending facility meets the rigorous safety and quality standards of Singapore’s petrochemical sector.

Design
Engineering
Procurement
Fabrication
Construction
Painting

"Strategically located in Meranti, Jurong Island, this facility serves as a critical node in Singapore's global liquid storage and blending network."

Critical Infrastructure

Dahej LNG Expansion

Strategic Energy Hub, Gujarat, India

Construction of massive LNG storage tanks for Petronet LNG Ltd in collaboration with IHI, Japan. This project involved complex cryogenic engineering to handle high-volume liquefied natural gas storage.

Diameter 80m
Height 40m
Units 02
Capacity 148k m³ Per Unit
Project Owners & Partners
IHI JAPAN
PETRONET LNG

Project Successfully Completed

APRIL 2009
  • Cryogenic-grade construction standards for LNG storage.
  • High-precision welding and insulation for 80m diameter shells.